Babson Reservoir Dam Improvements – Gloucester, Ma

Concrete work which includes demolition work and new concrete construction, residual lagoon improvements, earthwork, pump station interior demolition and hazardous material abatement and electrical improvements.

VIEW FULL PROJECT

Residuals Handling Facilities Upgrade – Lowell, Ma

Upgrades to the residuals handling facility which includes replacement of backwash recycle pumps, removal of water treatment residual solids from lagoons, and installation of an underdrain system and decant weirs […]

VIEW FULL PROJECT

Vernon C. Russell Water Treatment Plant Upgrades Phase 2 – Danvers, Ma

The Danvers project was phase 2 of the Vernon Russell Water Treatment Plant upgrades.  This two year project included construction of a new Ozone Treatment Facility, construction of Filter Building, […]

VIEW FULL PROJECT

Biosolids & Fall Brook Pump Station – Leominster, Ma

Rehab of existing systems at existing treatment facility. Project includes new concrete equipment pads, paint & coatings, buried piping, demolition, various pumps & equipment.

VIEW FULL PROJECT

Hartford Ave. & Wrentham Road WTP Improvements – Bellingham, Ma

Modifications to existing Hartford Ave. Water Treatment Plant to increase its flow capacity for iron and manganese removal to 2.40 MGD by combining the DPW existing Well No. 5 and […]

VIEW FULL PROJECT

Saint Mary Street Pump Station – Needham, Ma

Construction of a new Saint Mary Street Pump Station on the same property of the existing station. The project includes replacement of the pump station, including demolition and disposal of […]

VIEW FULL PROJECT

South Acton Water Treatment Plant – Acton, Ma

Construction of a new 1.7 MGD water treatment plant for iron and manganese removal from the Water District’s existing Assabet Wells and School Street Wells. The project includes submersible well […]

VIEW FULL PROJECT

Wastewater Treatment Facility & Pump Station Improvements – Billerica, MA

Waterline worked nearly two years on this project at the Wastewater Treatment Facility at Letchworth Ave. in Billerica, Massachusetts and several pump stations throughout the town. The work consisted of […]

VIEW FULL PROJECT

Quincy Point PS Renovation Project – Quincy, Ma

The work includes removing and replacing equipment including replacing the pumps and installing variable speed drives (VFD), upgrading the sluice gates, replacing the odor control unit, improved power distribution, removing […]

VIEW FULL PROJECT

Wastewater Treatment Facility & PS Upgrades – Newington, NH

Work included upgrading the Newington, NH Wastewater Treatment Facility (WWTF) and the Paul Brook and Shattuck Way.

VIEW FULL PROJECT

Hatchery Pipeline & Hydroelectric Project – Ware, Ma

The work includes the installation of a 20-inch ductile iron water main, fittings, valves, appurtenances and hydroelectric turbine including the construction of a new hydroelectric turbine building in the town […]

VIEW FULL PROJECT

MWRA Caruso PS – E. Boston, Ma

HVAC, mechanical and electrical upgrades at the Caruso Pump Station.

VIEW FULL PROJECT

Goodnow Lane Water PS – Framingham, Ma

Demolition and replacement of the existing horizontal split case pumps, building and electrical repairs.

VIEW FULL PROJECT

Primary & Secondary Clarifier Upgrades – Barnstable, Ma

Replace and/or rehabilitate existing primary and secondary clarifier equipment, structures, mechanical, electrical, instrumentation and controls at the town’s WPCF.

VIEW FULL PROJECT

UNH Water Treatment Plant Design/Build – Durham, NH

Design/Build project for the University of New Hampshire Water Treatment Plant.

VIEW FULL PROJECT

Read/West Pump & Storage Project – Lowell, Ma

Demolition at West Street Pump Station including, but not limited to, three 415 HP gasoline engines, three right angle gear drives, 7 1/2 ton capacity hoist and trolley, two 8′ […]

VIEW FULL PROJECT

Easterly Wastewater Treatment Facility Upgrades – Fitchburg, Ma

Complete mechanical and electrical rehab of the existing WWTF.

VIEW FULL PROJECT