CURRENT PROJECTS

Wastewater Treatment Facility & PS Upgrades – Newington, NH

Work included upgrading the Newington, NH Wastewater Treatment Facility (WWTF) and the Paul Brook and Shattuck Way.

VIEW FULL PROJECT

Hatchery Pipeline & Hydroelectric Project – Ware, Ma

The work includes the installation of a 20-inch ductile iron water main, fittings, valves, appurtenances and hydroelectric turbine including the construction of a new hydroelectric turbine building in the town […]

VIEW FULL PROJECT

MWRA Caruso PS – E. Boston, Ma

HVAC, mechanical and electrical upgrades at the Caruso Pump Station.

VIEW FULL PROJECT

Goodnow Lane Water PS – Framingham, Ma

Demolition and replacement of the existing horizontal split case pumps, building and electrical repairs.

VIEW FULL PROJECT

Primary & Secondary Clarifier Upgrades – Barnstable, Ma

Replace and/or rehabilitate existing primary and secondary clarifier equipment, structures, mechanical, electrical, instrumentation and controls at the town’s WPCF.

VIEW FULL PROJECT

UNH Water Treatment Plant Design/Build – Durham, NH

Design/Build project for the University of New Hampshire Water Treatment Plant.

VIEW FULL PROJECT

Read/West Pump & Storage Project – Lowell, Ma

Demolition at West Street Pump Station including, but not limited to, three 415 HP gasoline engines, three right angle gear drives, 7 1/2 ton capacity hoist and trolley, two 8′ […]

VIEW FULL PROJECT

Easterly Wastewater Treatment Facility Upgrades – Fitchburg, Ma

Complete mechanical and electrical rehab of the existing WWTF.

VIEW FULL PROJECT